Bulpham, Thurrock
Full civil engineering design for an 85-dwelling residential development in Bulpham, Thurrock. The scheme required a detailed drainage strategy to manage surface water runoff to a watercourse, including an attenuation basin and SuDS features. Highway works included a new priority junction onto the local road network and estate road design to adoptable standards.